Skip to main content
Zoom the image with the mouse

Troy Lee Designs

Troy Lee Designs Flowline Youth MTB Shorts Shell Spray Camo Army


$79.99
Choose Options:
Clear Selection
Size Chart

Product Barcode

×
Stock Availability
National Delivery

Select an Option

Brisbane Store
In Store & Click'n'Collect
Canberra Store
In Store Only
Fast Shipping Free Shipping On Orders Over $129
Price Match Contact Us Here
Easy Returns Info Here
Payment Options Interest FREE Options Over $30
Pushys ID 144948
Product ID 144948
 
Troy Lee Designs Flowline Shorts For Fearless Young Riders
TLD products like these Troy Lee Designs Flowline Youth Shorts Shells are researched, designed, and thoroughly tested before the great athletes around the world get their hands on them and turn them into winners. TLD's acute attention to detail paired with a fearless sense of style and design make for a superior quality product. With a vast selection of colours, construction and levels of protection, there is a perfect fit for every style of riding.

Affordable, But Still Troy Lee Designs Quality
Flowline's contribution to the TLD MTB category is considerable. These Flowline Youth Shorts incorporate TLD's best technical innovations in a comfortable, technical, yet affordable kit. This gear is aimed at the enthusiast mountain biker, with minimalist features, but the quality, fit and feel you've come to expect from Troy Lee Designs.
. Youth size mountain bike shorts
. Perfect for youngsters having a crack at the MTB world
. Ride Fit
. Liner not included - so you can choose your own
. Hand pockets (x 2) for easy access to ride essentials
. Self-fabric waist adjusters
. Zipper fly with single snap button at waist
. Bluesign Approved fabric ethically produced, caring for the workers

Specifications
. Product: Troy Lee Designs Flowline Youth Shorts Shell
. Outseam: 55cm (21.5")
. Material: 100% Coolmax Polyester